CN

TOP

Central Park Public Domain
Adding to the energy and vitality of inner-city Chippendale
Central Park Public Domain
Architect
Category
Project Year
2020
Site Area
unkown m²
Location
悉尼 / 澳大利亚
Text description provided by the architects

Turf Design Studio与JeppeAagaard Andersen受Frasers Property委托,合作重新规划齐本德尔区百老汇大街的卡尔顿联合啤酒厂的公共区域。Turf的首要任务是与Foster + Partners,Ateliers Jean Nouvel,Johnson Pilton Walker,Tonkin Zulaikha Greer和Tzannes Associates合作,审查和完善该项目继承的原始总体规划。

Turf Design Studio with Jeppe AagaardAndersen was commissioned by Frasers Property to reimagine the public domain ofthe Carlton United Brewery site at Broadway in Chippendale. Turf’s first taskwas to work with Foster + Partners, Ateliers Jean Nouvel, Johnson PiltonWalker, Tonkin Zulaikha Greer and Tzannes Associates to review and refine theoriginal masterplan inherited with the project.

自开放以来,中央公园已成为城市生活中备受喜爱的新场所。从日常的遛狗到瑜伽活动,再到市集和众多年度重大活动,中央公园已被社区各级人士所接受。
Since opening, Central Park has become a much-loved new addition to city life.From the everyday dog walk or yoga class, to markets and numerous annual majorevents, Central Park has been embraced by the community at all levels.

中央公园的公共区域体现了经过精心设计且清晰可辨的公有领域框架,是如何统一场地并重新连接起一个城市的。场地的中心是齐本德尔公园(ChippendaleGreen),该公园朝北,设有阳光普照的梯田草坪,远离城市快节奏的脚步。
Central Park’s public domain exemplifies how a well-considered and legiblepublic domain framework can both unite a site and restitch a city. At the heartof the site is Chippendale Green; a north-facing park of terraced, sun drenchedlawns tucked away from the frenetic pace of the city.

TURF用十二年时间,以12个主要的公共领域和建筑项目,在创建全新的城市区域方面发挥了重要作用,其中包括:第一和第二阶段的基础设施工程、八条新街道、齐本德尔公园、公园步道、七条直通站点的步道以及中央公园一号。
Twelve years on TURF has played a formative role in the creation of an entirelynew city precinct delivered via 12 major public domain and building projectsincluding: Stages 1 & 2 Infrastructure Works, eight new streets,Chippendale Green, Park Lane, seven thru-site pedestrian links, One CentralPark.

如今,4200名居民和1200名工人、众多超市和咖啡馆构成了一个充满活力的新城区,为曾经荒料的百老汇大街注入新活力,同时为齐本德尔市中心带来新的生机。
Now almost complete, the mix of 4200 residents and 1200 workers, supermarketsand cafes makes for a vibrant new urban village breathing new life into whatwas a baron and desolate stretch of Broadway, while adding to the energy andvitality of inner-city Chippendale.


Design: Turf Design Studio

Location: Chippendale, New South Wales,Australia

Project size: 22700 m2

Site size: 58000 m2

Project Budget: USD 4.00

Completion date:2012



Appreciations towards Turf Design Studio for sharing wonderful work . Click to see more works!
Published on 2023/12/19
Editor:Lucas Lee
Enter ID in the Search Bar P2561 Direct to the article <https://www.waspeak.com/project/s/central-park-public-domain-turf.html>